Granada Force Main Segment 4 Replacement
Client
Sewer Authority Mid-Coastside
Location
Half Moon Bay, CA
The project included the installation of over 1,400 LF of 16-inch HDPE force main via Horizontal Directional Drill method. A temporary bypasswas required to enable the transition from the existing force main to the newly installed force main. Challenges include working near environmentally sensitive areas. The project requires storm water control measures and acquiring necessary permits.