Rollins/Cowan Pump Station - Flap Gates Replacement

Client

City of Burlingame

Location

Burlingame, CA

This project included the removal and replacement of ten 24-inch and 36-inch in diameter flap valves located at two stormwater pumping station locations. Eight of the flap valves were mounted on stormwater pump discharge pipes and two were mounted on gravity storm drain pipes.


Previous
Previous

Culvert Crossing Repairs

Next
Next

Ralston Avenue Sewer Rehabilitation