Ralston Avenue Sewer Rehabilitation
Client
City of Belmont
Location
Belmont, CA
This project includes the replacement of existing Vitrified Clay Pipe (VCP) with 1,600 linear feet of PVC and 2,100 linear feet of HDPE pipe through Horizontal Directional Drilling (HDD) and pipe reaming construction methods.
Pipe sizes vary from 8-inch to 27-inch in diameter and excavation depth varies from 8 feet to 18 feet deep.
The work also included the rehabilitation and/or replacement of over 20 manholes along the alignment.