WWTP Reliability
Client
Silicon Valley Clean Water (SVCW)
Location
Redwood City, CA
This design-build project consists of improvements to three wastewater treatment processes located throughout the Silicon Valley Clean Water facility. Updates include new piping, electrical equipment and instrumentation for two aeration tanks. It also includes the installation of new back wash pumps for the dual media filters, which includes the removal of existing pumps, piping and electrical systems and the installation of new systems. In the solids handling building, the existing centrifuge, which is no longer used, is being removed, including all associated piping and electrical. Work is coordinated and conducted during normal operations of the facility without interruption to facility operations due to strict sequencing and system outage coordination and adherence.